INTRODUCTION
Surplus weirs are used to dispose of the surplus water
from tank to downstream channels, downstream or surplus courses, or drainage
channels. It disposes the water from upstream catchments to down stream
catchments or downstream tanks. These interlinked tanks in a certain area are
called a “Cascade”. Tanks in a cascade all have a common supply channel.
Proper distribution of water carried by a main canal among the branch canals depending upon it
Reducing the hydraulic slope (gradient) in a canal (if canal water slope is greater than the allowable water slope)
Reducing head on existing structures
Collecting sediments at US of structures (sand strap)
TERMINOLOGY USED
•
Discharge Q
•
Coefficient Of Discharge Cd
•
Maximum Water Level M.W.L (The maximum water level is higher than full tank level in the water
spread area of the tank for storing the water. When the inflow is higher than
outflow of water in surplus weirs that time the water could reach the maximum
water level. It restricted to store the water up to this maximum water level
during rainy days.)
•
Full Tank Level F.T.L (The full tank level is the highest level which water could be stored in
the tank. Since or any excess water will go out through the surplus weir.)
•
Catchment Area M
•
Height Of Weir H
•
Head Over The Weir h
METHODOLOGY
Ø
Collecting catchment area details
Ø
Selection of type of work
Ø Estimation of flood
discharge.
Ø Design of weir.
DESIGN ELEMENTS
1) Estimation of flood discharge.
2) Length of surplus weir.
3) Crest width.
4) Base width.
5) Aprons of the weir
6) Upstream aprons
7)
Downstream
aprons
SELECTION OF TYPE OF WEIR WORK
•
Type A: weir
water is dropped immediately below crest wall.
•
Type B:
delivered from crest on to a sloping masonry apron.
•
Type C: similar
to B but with rough sloping apron.
•
Type D: weir
with stepped aprons
RYVE’S FORMULA
Ryve’e
Coefficient
C
|
Q=CA2/3
|
15
|
15*A2/3
|
9
|
9*A2/3
|
8.1
|
8.1*A2/3
|
6.8
|
6.8*A2/3
|
§ Q=C*A2/3
§ A= Area of catchment
§ C=Ryve’s coefficient
NO.
|
Type of weir
|
Value of Cd
|
Reduced formula for discharge per meter length of
weir
|
1
|
Weirs
with crest width up to one meter
|
0.625
|
1.84*H3/2
|
2
|
Weirs with
over one meter width
|
0.562
|
1.66*H3/2
|
3
|
Rough
stone sloping escapes
|
0.500
|
1.48*H3/2
|
4
|
Flush
escapes
|
0.437
|
1.29*H3/2
|
|
SAMPLE PROBLEM DESIGN
EXAMPLE: Design a surplus work of a tank forming part
of a chain of tanks. The combined catchment area of the group of tanks is 25,89
sq. kilometers and the area of the catchment intercepted by the upper tanks is
20.71 sq. kilometers.
Design:
- Here,
MWL (maximum water level) =12.75m
FTL (full tank level) =12m
Estimation
of flood discharge entering the tank:-
Combined
catchment area of the group of tanks= 25.89 sq. kms
Intercepted
catchment area of the upper tanks =
20.71 sq. kms
Now,
Q= CM2/3-cm2/3
Where,
C= 9 (assumed)
C= 1.50 (assumed)
Q= 9*25.892/3-1.50*20.712/3
Q=67.45 cubic meters
Length
of surplus weir:-
FTL
=+12m
Crest
level =+12m
Submersion
of foreshore i.e. M.W.L. =+12.75 m
Therefore,
head of discharge over the weir is 12.75-12 (MWL-FTL) = .75m
Since,
temporary regulating arrangements are to be made on top of the weir, to store
water at times of necessity, grooved dam stones 15cms x 15 cms, will be fixed
in the centre of the crest at one meter interval with top at MWL.
The
weir may be assumed as broad crested weir.
So,
Q=2/3*Cd*h*(2gh)1/2
Where,
Cd =0.562
h
=0.75m
Q=1.66*h2/3
=1.66*0.752/3
=1.66*0.65
=1.08 cubic meters/sec
Clear
length of surplus weir required= 67.45/1.08
=62.5 or say
=63 meters
Since,
the dam stones are to be fixed on top at 1 meter clear intervals, the no. of
openings will be 63.
So,
the no. of dam stones are required will be 62 Nos.
Size
of the dam stones =15cms x
15cms
Projecting
length above crest =75cms
Therefore,
overall length of the surplus weir between the abutments = 63+62*0.15=
72.30meters
Providing
overall length of 75meters.
•
Weir:-
Crest
level =+12.00 FTL
Top
of dam stone (Top of shutter) =+12.75 MWL
Ground
level =+11.00
Level
where hard soil at foundation is met =+9.50
Foundation
level is fixed at 9m.
Foundations
are about 0.50m deeper into soil.
Thickness
of foundation concrete is 0.60m.
So,
Top
of foundation concrete =+9.60
Height
of weir above foundation =12.00-9.60
=2.40meters
Crest
width:-
Generally
the crest width is assumed as 0.55[(H)1/2+(h)1/2]
Where,
H =height of weir
H =head over the weir
a=0.55[(2.40)1/2+(0.75)1/2]
=1.3
So
crest width is taken as 1.30m.
Base
width:-
The
maximum overturning moment due to water thrust is equal to
M0=
(H+S)3/6
Where,
H= height of weir above the
foundation
S= height of shutters
The
slope of weir on either side being the same, the restoring moment M of the weir
due to wt. of masonry is
Where,
H= height of weir
p= sp. Gravity of masonry,(=2.25)
a= crest width of weir (in this problem
a=1.30)
b= base width of
weir,(=2.40meters)
S= height of shutters above weir crest,(=0.75)
The
weir will have a trapezoidal profile.
Height
of wall above foundation in upstream side= 13.05-9.60= 3.45 meters
Upstream
side transition
In
order to give an easy approach, the upstream side wing wall are given a splay
of 1 in 3.
Downstream
side Wings and Returns
As
the water after passing over the weir goes down rapidly to normal M.F.L., the
wings and returns need not be as high as those on the upstream sides.
The
top of wing wall may be fixed at +11.00.
So
the height of wall above foundation concrete= 11.00-9.60= 1.40 meters.
Base
width required= 1.40 x 0.40=0.56 meters.
Minimum
base width= 0.60
So
base width= 0.60 meters is adopted.
Downstream
transition
The
downstream side wing walls are given a splay of 1 in 5.
Aprons
of weir
The
ground level at site of weir= +11.00
Upstream
aprons
Generally
no aprons are required on the upstream side of the weir but sometimes puddle
apron may be provided.
It
is also sometimes provided with a nominal rough stone apron 30 cm thick packed
well on puddle clay apron.
Downstream
apron
Stepped
apron in two stages is provided. The aprons may be designed for hydraulic
gradient 1 in 5 which is within the safety limit and will not start undermining
the structure.
program to calculate weir discharge
http://irrigation.wsu.edu/Content/Calculators/Water-Measurements/Rectangular-Contracted-Weir.php
program to calculate weir discharge
http://irrigation.wsu.edu/Content/Calculators/Water-Measurements/Rectangular-Contracted-Weir.php